Free printable
Post-construction cleaning checklist (printable)
Post-construction cleaning checklist
Rough clean
| Task | Done | Initials |
|---|---|---|
| Remove construction debris, scrap and packaging | ||
| Sweep and vacuum all floors | ||
| Remove large dust from ledges, sills and fixtures | ||
| Clean out electrical and HVAC boxes (power off, with GC approval) | ||
| Clear stickers and labels from windows and fixtures |
Final clean
| Task | Done | Initials |
|---|---|---|
| Dust ceilings, vents, light fixtures and diffusers top to bottom | ||
| Wipe walls, doors, frames and trim | ||
| Clean interior glass, mirrors and window tracks | ||
| Clean cabinets and drawers inside and out | ||
| Clean and polish restroom fixtures, partitions and tile; remove grout haze | ||
| Clean appliances inside and out | ||
| Remove paint, caulk and adhesive spots | ||
| Vacuum and damp-mop floors; scrub hard floors; vacuum carpet | ||
| Wipe switches, outlets and hardware |
Touch-up
| Task | Done | Initials |
|---|---|---|
| Re-dust surfaces after punch-list work | ||
| Spot-clean walls and glass | ||
| Final vacuum and mop | ||
| Remove all crew trash and equipment |
Common questions
What does post-construction cleaning include?
Debris removal, top-to-bottom dusting including vents and fixtures, glass, cabinets, restroom fixtures, paint and adhesive removal, and floors, in a rough clean, a final clean and a touch-up.
How much does post-construction cleaning cost?
Published ranges run $0.15–$0.40 per sq ft for a rough clean and $0.20–$0.60 for a final clean, mostly from residential data; commercial jobs cost more. See post-construction cleaning cost.